Migrating to a New CMS

By TRION
Why Migrate?
There are many reasons to migrate to a new content management system, including improved features, better performance, and enhanced security.
Steps for a Successful Migration
- Plan Ahead: Create a detailed migration plan.
- Backup Data: Always back up your existing content before migrating.
- Test the New CMS: Ensure everything works as expected before going live.
Following these steps can help ensure a smooth transition to your new CMS.
Die technischen Daten
Elektrische Spezifikationen
Nominale Spannung 12,8 V
NOMINALE KAPAZITÄT 150 AH
RESERVEKAPAZITÄT 360 MIN
Ladespezifikationen
MAXIMALER LADESTROM 250 A
EMPFOHLENE LADESPANNUNG 14,2 - 14,6 V
Temperaturspezifikationen
EntlAdetemperatur -20 bis 60°C
Ladetemperatur 0 bis 60°C
Lagertemperatur -40 bis 60°C
Mechanische Spezifikationen
GEWICHT 22 KG (48.5 LBS.)
ABMESSUNGEN (L x B x H) 340 x 179 x 240 mm
